The Importance of Lifting Equipment Inspections Under LOLER 1998

The Importance of Lifting Equipment Inspections Under LOLER 1998

The Importance of Lifting Equipment Inspections Under LOLER 1998

Lifting operations play a critical role in construction, logistics, and many other industries. However, poorly maintained lifting equipment can lead to serious accidents, injuries, and costly project delays. Under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), all lifting equipment must be regularly inspected and properly maintained to ensure safe operation.

Employers are legally required to ensure that lifting operations are carried out safely, with competent personnel overseeing the use and maintenance of lifting equipment. Failing to meet LOLER requirements can result in enforcement action from the Health and Safety Executive (HSE), including fines and project shutdowns.


What Does LOLER 1998 Require?

LOLER places strict requirements on the use of lifting equipment, including:

•Thorough Examination & Inspection – Lifting equipment must be examined at regular intervals by a competent person. For most lifting equipment, this means every 6 months for lifting accessories and every 12 months for lifting machinery.

•Risk Assessments & Safe Use – Employers must assess lifting operations to ensure they are planned, supervised, and conducted safely.

•Record Keeping – Thorough examination reports must be kept and made available to enforcing authorities if requested.

These requirements apply to all businesses that use lifting equipment, from construction sites using cranes, hoists, and telehandlers to warehouses operating forklifts and lifting accessories.


Ensuring Workforce Competency in Lifting Operations

To comply with LOLER, businesses must ensure that employees involved in lifting operations are trained and competent. This includes:

•Appointed Persons – Responsible for planning lifting operations and ensuring compliance.

•Crane/Lifting Supervisors – Overseeing lifting activities on-site.

•Slinger/Signallers – Ensuring the safe attachment and movement of loads.

•Plant Operators – Operating cranes, telehandlers, and forklifts safely.

Competency can be demonstrated through formal NVQs and holding recognised CPCS, NPORS, or CSCS competency cards.


How All Star Safety Can Help

At All Star Safety, we provide expert support to help businesses meet LOLER requirements and maintain a competent workforce. Our services include:

✔ Lifting Equipment Inspections & Compliance Checks – Ensuring all lifting equipment meets LOLER standards.

✔ NVQ Assessments for Lifting Personnel – Supporting operators, signallers, and supervisors in achieving recognised qualifications.

✔ LOLER Risk Assessments & Lift Planning – Helping businesses ensure safe lifting operations.

✔ Health & Safety Consultancy – Providing expert advice to keep your business compliant.

Contact us to see how we can assist you in staying safe and compliant.

📞 01473 561 402

📩 info@allstarsafety.co.uk

🌐 Contact us here

The Role of Appointed Persons in Lifting Operations

The Role of Appointed Persons in Lifting Operations

Lifting operations are one of the highest risk activities on a construction site, and every lift needs to be properly planned before it happens. The person responsible for that planning is the Appointed Person. Their role is defined in BS 7121, the code of practice for the safe use of cranes, and it is how most construction projects meet the planning duty set out in LOLER 1998. This guide explains what an Appointed Person does, why employers must be able to prove their competence, and the NVQ route that demonstrates it.

Need an Appointed Person for your project? See our Appointed Person site visits and lift planning services.

What Does an Appointed Person Do?

The Appointed Person has overall control of lifting operations on behalf of the organisation that needs the lift. Their key responsibilities include:

  • Planning lifting operations. Planning and organising every lift so it can be carried out safely, in line with LOLER 1998 and BS 7121.
  • Risk assessments and method statements. Identifying the hazards involved in each lift and producing the lift plan and control measures to manage them.
  • Selecting lifting equipment. Choosing suitable cranes and lifting accessories, and making sure they are properly maintained and examined.
  • Coordinating the lifting team. Working with crane supervisors, slinger signallers and operators so everyone understands the plan and how the lift will be communicated.
  • Making sure the team is competent. Checking that everyone involved in the lifting operation is trained and competent for the part they play.

Without a trained and competent Appointed Person, lifting operations can lack the oversight they need. That increases the risk of serious accidents, injuries, regulatory breaches and costly project delays.

How the Appointed Person Fits Into the Lifting Team

The Appointed Person plans the lift, but they rarely carry it out alone. BS 7121 sets out a team of roles, each with a distinct responsibility:

  • Appointed Person: plans the lifting operation, produces the lift plan and has overall control of the lift on behalf of the organisation.
  • Crane Supervisor: controls the lifting operation on site and makes sure it is carried out in line with the Appointed Person’s plan.
  • Slinger Signaller: attaches and detaches loads, and directs the movement of the crane and load using agreed signals or radio.
  • Crane Operator: operates the crane safely, following the lift plan and the directions given by the slinger signaller.

Why Employers Must Ensure Appointed Person Competence

Under UK law, employers have a duty to make sure lifting operations are managed by competent people. Several pieces of legislation and guidance apply:

  • LOLER 1998. Requires every lifting operation to be properly planned by a competent person, appropriately supervised and carried out safely.
  • BS 7121. The code of practice for the safe use of cranes. It defines the Appointed Person role and how lifting operations should be planned.
  • MHSWR 1999. The Management of Health and Safety at Work Regulations require employers to assess risks and use competent people to help them meet their duties.
  • HASAWA 1974. The Health and Safety at Work etc. Act places a general duty on employers to protect the health and safety of their employees and others.

Failing to meet these duties can lead to enforcement action by the Health and Safety Executive (HSE). Being able to show that your Appointed Person holds a recognised qualification is one of the clearest ways to demonstrate competence.

Proving Competence: The Appointed Person NVQ

The recognised qualification for the role is the Level 5 NVQ in Controlling Lifting Operations – Planning Lifts. It is assessed on real evidence from your own work, so it proves you can do the job rather than just pass a test.

  1. Register and induction. You must be working in a role where you plan lifting operations. After registration, your assessor takes you through the qualification at induction.
  2. Build your evidence. You gather evidence from the lifts you plan on site, such as lift plans and risk assessments, and complete the knowledge tasks. Level 5 qualifications must be completed within 18 months of induction.
  3. Achieve the NVQ and apply for your card. Once you have completed the Level 5 NVQ in Controlling Lifting Operations – Planning Lifts, you can apply for the CPCS Blue Competent Operator Card.

For employers, an NVQ qualified Appointed Person brings clear benefits:

  • Legal compliance. It demonstrates that lifting operations are planned by a competent person, as LOLER 1998 requires.
  • Reduced risk of accidents. Proper lift planning minimises hazards and keeps every lift safe and controlled.
  • Verified competence. The NVQ proves an individual has met the industry standard, not just attended a course.
  • Improved site efficiency. Well planned lifts run smoothly, without unnecessary delays to the programme.

How All Star Safety Can Help

We provide NVQ assessments and consultancy services to support safe, compliant lifting operations:

  • Appointed Person NVQ assessment. Helping candidates achieve the Level 5 NVQ in Controlling Lifting Operations – Planning Lifts. View our lifting operations NVQs.
  • LOLER compliance and lift planning support. Making sure your lifting operations meet legal and safety requirements.
  • Site safety audits. Reviewing lifting operations on site to identify risks and check your team’s competence.
  • Health and safety consultancy. Expert guidance on improving lifting safety and competence across your business. Explore our consultancy services.

Frequently Asked Questions

Does every lifting operation need an Appointed Person?

LOLER 1998 requires every lifting operation to be properly planned by a competent person, appropriately supervised and carried out safely. On construction projects, BS 7121 sets out the Appointed Person as the role that takes on that planning responsibility.

Is an Appointed Person the same as a Crane Supervisor?

No. The Appointed Person plans the lift and has overall control. The Crane Supervisor controls the lifting operation on site and makes sure it follows the Appointed Person’s plan.

Which NVQ does an Appointed Person need?

The Level 5 NVQ in Controlling Lifting Operations – Planning Lifts. Completing it allows you to apply for the CPCS Blue Competent Operator Card.

How long does the Appointed Person NVQ take?

It depends on how quickly you can gather evidence from the lifts you plan at work. Level 5 qualifications must be completed within 18 months of your induction.

Talk to Us

For NVQ assessment for your Appointed Persons, or support with lift planning and LOLER compliance, call us on 01473 561 402 or email info@allstarsafety.co.uk.

Related reading: Lifting operations regulations: legal requirements and competence

Ensuring Competence in Lifting Operations: Legal Requirements and Best Practices

Ensuring Competence in Lifting Operations: Legal Requirements and Best Practices

Lifting operations on construction sites and in industrial settings must be planned, supervised and carried out by people who can demonstrate they are competent to do the job. This is not a matter of best practice alone. It is a legal duty, and the regulations are specific about who can plan a lift, who can supervise it and how equipment must be maintained. This guide covers what UK law requires, how competence is evidenced in practice, and what a compliant lift plan looks like.

Need a lift plan written or checked? See our lift planning services, including independent lift plan reviews.

Who Counts as a Competent Person in Lifting Operations?

LOLER 1998 repeatedly refers to a competent person but does not define a single qualification. In practice, competence means the right combination of training, knowledge and practical experience for the specific task, and the employer must be able to evidence it if asked. For lifting operations this breaks down into distinct roles, each with its own responsibilities:

Appointed Person

Plans the lift, selects the equipment and produces the lift plan. Normally holds a Level 5 NVQ in Controlling Lifting Operations, Planning Lifts.

Lift Supervisor

Supervises the lift on site, ensures the plan is followed and stops the operation if conditions change.

Crane Operator

Operates the lifting equipment, holding a recognised plant card for that specific category of machine.

Slinger Signaller

Attaches and detaches the load, selects the correct accessories and directs the operator using agreed signals.

Plant Operator

Operates lifting equipment other than cranes, including telehandlers and excavators used for lifting duties.

Competent Examiner

Carries out thorough examinations, and must be sufficiently independent of the operating team to give an objective assessment.

How competence is evidenced

Competence is normally demonstrated through a combination of a formal qualification, recorded practical experience and a recognised competence card such as CPCS, NPORS or CSCS. The card alone is not proof of competence, it is evidence that an assessment has taken place, and employers are expected to satisfy themselves that the individual is suitable for the particular lift.

Our lifting operations NVQs cover slinger signaller, lift supervisor and appointed person roles, and are assessed in the workplace using real work activities rather than exams. Operators also need a recognised plant card, which we deliver through NPORS assessments.

Legal Framework and Standards

LOLER 98

Lifting Operations and Lifting Equipment Regulations 1998

LOLER 98 mandates that all lifting operations involving lifting equipment are properly planned by a competent person, appropriately supervised, and carried out safely. Regulation 8 specifically requires that lifting operations are organised to prevent injury, taking into account the nature of the load, the environment, and the equipment used.

Full guidance is published by the Health and Safety Executive.

BS7121

Code of Practice for Safe Use of Cranes

The BS7121 series provides guidance on the safe use of cranes, including selection, maintenance, inspection, and operation. By adhering to BS7121, companies ensure that lifting operations meet industry best practices and reduce the risk of accidents.

BS7121 is not law in itself, but courts and the HSE treat it as the benchmark for what reasonable practice looks like.

MHSWR 1999

Management of Health and Safety at Work Regulations

Under MHSWR, employers must assess all significant risks to health and safety, including those associated with lifting operations. Effective risk assessments identify potential hazards, evaluate the likelihood of accidents, and determine the necessary control measures.

In practice this means a documented risk assessment and method statement for every non-routine lift.

HASAWA 1974

Health and Safety at Work etc. Act 1974

The HASAWA sets the foundation for all health and safety regulations in the UK. It requires employers to ensure, so far as is reasonably practicable, the health, safety, and welfare of employees and others affected by their operations. For lifting tasks, this includes using well-maintained equipment, providing proper training, and following established safety procedures.

Failing to meet these duties can lead to enforcement action from the HSE, including improvement and prohibition notices, alongside project delays, invalidated insurance and a materially higher risk of serious injury on site. Where a lift goes wrong and competence cannot be evidenced, the employer is usually the party held responsible.

How LOLER differs from PUWER

The two regulations are often confused. PUWER 1998 covers all work equipment and requires it to be suitable, maintained and used by trained people. LOLER sits on top of that and adds specific duties wherever equipment is used for lifting: the equipment must be strong and stable enough for the load, positioned to minimise risk, and subject to thorough examination at set intervals. If you lift with it, both apply.

Thorough Examination: How Often Is It Required?

One of the most common compliance failures is missing a thorough examination. LOLER sets minimum intervals, and these apply regardless of how new or lightly used the equipment is.

6
Months for lifting accessories such as slings, chains and shackles
6
Months for equipment used to lift people
12
Months for other lifting equipment such as cranes and hoists

Equipment must also be thoroughly examined after installation, after assembly at a new site, and following any event likely to have affected its integrity. Where a written examination scheme drawn up by a competent person specifies different intervals, that scheme takes precedence.

What a Lift Plan Should Contain

Regulation 8 requires lifting operations to be properly planned, but the detail sits in BS7121. A workable lift plan should cover:

  • The weight, dimensions and centre of gravity of the load
  • The lifting equipment and accessories selected, with their safe working loads
  • Ground conditions, outrigger positions and crane configuration
  • The exclusion zone and how the public and other trades are protected
  • Weather limits, particularly wind speed thresholds
  • Named personnel for each role and evidence of their competence
  • The sequence of operations and communication method
  • Emergency arrangements if the lift cannot be completed

Routine, repetitive lifts can be covered by a generic plan. Anything complex, tandem lifts, lifts over occupied areas, or lifts near overhead power lines, needs a specific plan produced by an Appointed Person.

How All Star Safety Can Help

At All Star Safety, we provide expert planning, assessment and advice to ensure that lifting operations are conducted safely and in full compliance with LOLER 98, BS7121, MHSWR and HASAWA. Our services include:

NVQ Assessments for Lifting Roles

We assess candidates towards recognised qualifications including the Level 5 NVQ in Controlling Lifting Operations, Planning Lifts, alongside slinger signaller and lift supervisor routes. See our full range of lifting operations NVQs.

Lift Planning Services

We create detailed lift plans that outline the equipment required, the sequence of operations, and the necessary safety measures.

Lifting Operations Risk Assessments

Documented risk assessments and method statements written to satisfy LOLER 98, BS7121 and MHSWR 1999 requirements.

Competency Verification

We help employers confirm their workforce holds the correct CPCS, NPORS or CSCS cards for the roles they are performing, and identify where qualifications are missing or due to expire.

Site Audits and Compliance Checks

Our team can conduct comprehensive audits of your lifting operations and overall site safety, identifying areas for improvement and providing actionable recommendations. See our full range of health and safety consultancy services.

Frequently Asked Questions

What are the legal requirements for lifting operations in the UK?

Lifting operations are governed principally by LOLER 1998, which requires every lift to be properly planned by a competent person, appropriately supervised and carried out safely. PUWER 1998, MHSWR 1999 and the Health and Safety at Work etc. Act 1974 also apply, and BS7121 provides the recognised code of practice for the safe use of cranes.

Who can plan a lifting operation?

Planning must be carried out by a competent person, normally an Appointed Person who holds a relevant qualification such as a Level 5 NVQ in Controlling Lifting Operations. The employer is responsible for satisfying itself that the individual has the necessary training, knowledge and experience for the specific lift.

Does a competence card prove someone is competent?

Not on its own. A CPCS, NPORS or CSCS card is evidence that an assessment has taken place, but competence also depends on relevant practical experience and familiarity with the specific equipment and site conditions. The duty to satisfy itself that a person is competent sits with the employer, not the card scheme.

How often must lifting equipment be thoroughly examined?

Every six months for lifting accessories and for any equipment used to lift people, and every twelve months for other lifting equipment. Examination is also required after installation, after assembly at a new location, and following any event that may have affected the equipment's integrity. A written examination scheme drawn up by a competent person can set different intervals.

Is a lift plan a legal requirement?

LOLER Regulation 8 requires lifting operations to be properly planned, and in practice that means a documented lift plan. Routine and repetitive lifts can be covered by a generic plan, but complex lifts need one prepared specifically for that operation by an Appointed Person.

What qualifications do slinger signallers and lift supervisors need?

Both roles need to demonstrate competence, usually through an NVQ assessed in the workplace alongside a recognised plant or competence card. All Star Safety delivers NVQ assessments for slinger signaller, lift supervisor and appointed person roles across Suffolk, East Anglia and the wider UK.

Get in touch now

If you need professional assistance with lift planning, NVQ assessment, site safety audits, or health and safety guidance, contact All Star Safety today. Let us help you achieve compliance, protect your workforce, and ensure smooth, efficient operations.

Health and Safety Requirements for Lifting Operations in the UK

Health and Safety Requirements for Lifting Operations in the UK

In the UK, lifting operations on construction sites and in other industries must be carefully planned and executed in line with established regulations and standards. These requirements are designed to protect workers, ensure the safe movement of loads, and maintain compliance with national health and safety laws. Understanding these legal requirements is essential for anyone involved in lift planning and execution.

If you need help planning a lift, see our lift planning services.

Legal Framework and Standards

LOLER 98

Lifting Operations and Lifting Equipment Regulations 1998

LOLER 98 mandates that all lifting operations involving lifting equipment are properly planned by a competent person, appropriately supervised, and carried out safely. Regulation 8 specifically requires that lifting operations are organised to prevent injury, taking into account the nature of the load, the environment, and the equipment used.

Full guidance is published by the Health and Safety Executive.

BS7121

Code of Practice for Safe Use of Cranes

The BS7121 series provides guidance on the safe use of cranes, including selection, maintenance, inspection, and operation. By adhering to BS7121, companies ensure that lifting operations meet industry best practices and reduce the risk of accidents.

BS7121 is not law in itself, but courts and the HSE treat it as the benchmark for what reasonable practice looks like.

MHSWR 1999

Management of Health and Safety at Work Regulations

Under MHSWR, employers must assess all significant risks to health and safety, including those associated with lifting operations. Effective risk assessments identify potential hazards, evaluate the likelihood of accidents, and determine the necessary control measures.

In practice this means a documented risk assessment and method statement for every non-routine lift.

HASAWA 1974

Health and Safety at Work etc. Act 1974

The HASAWA sets the foundation for all health and safety regulations in the UK. It requires employers to ensure, so far as is reasonably practicable, the health, safety, and welfare of employees and others affected by their operations. For lifting tasks, this includes using well-maintained equipment, providing proper training, and following established safety procedures.

How LOLER differs from PUWER

The two regulations are often confused. PUWER 1998 covers all work equipment and requires it to be suitable, maintained and used by trained people. LOLER sits on top of that and adds specific duties wherever equipment is used for lifting: the equipment must be strong and stable enough for the load, positioned to minimise risk, and subject to thorough examination at set intervals. If you lift with it, both apply.

Thorough Examination: How Often Is It Required?

One of the most common compliance failures is missing a thorough examination. LOLER sets minimum intervals, and these apply regardless of how new or lightly used the equipment is.

6
Months for lifting accessories such as slings, chains and shackles
6
Months for equipment used to lift people
12
Months for other lifting equipment such as cranes and hoists

Equipment must also be thoroughly examined after installation, after assembly at a new site, and following any event likely to have affected its integrity. Where a written examination scheme drawn up by a competent person specifies different intervals, that scheme takes precedence.

Who Counts as a Competent Person?

LOLER repeatedly refers to a competent person, but does not define a single qualification. In practice, competence means the right combination of training, knowledge and practical experience for the specific task, and an employer must be able to evidence it. For lifting operations this usually breaks down into distinct roles:

  • Appointed Person — plans the lift, selects the equipment and produces the lift plan
  • Lift Supervisor — supervises the lift on site and ensures the plan is followed
  • Crane Operator — operates the equipment, holding a recognised plant card for that category
  • Slinger Signaller — attaches and detaches the load and directs the operator
  • Competent Examiner — carries out thorough examinations independently of the operating team

Demonstrating competence usually means holding a relevant qualification. Our lifting operations NVQs cover slinger signaller, lift supervisor and appointed person roles, and are assessed in the workplace using real work activities rather than exams. Operators also need a recognised plant card, which we deliver through NPORS assessments.

What a Lift Plan Should Contain

Regulation 8 requires lifting operations to be properly planned, but the detail sits in BS7121. A workable lift plan should cover:

  • The weight, dimensions and centre of gravity of the load
  • The lifting equipment and accessories selected, with their safe working loads
  • Ground conditions, outrigger positions and crane configuration
  • The exclusion zone and how the public and other trades are protected
  • Weather limits, particularly wind speed thresholds
  • Named personnel for each role and evidence of their competence
  • The sequence of operations and communication method
  • Emergency arrangements if the lift cannot be completed

Routine, repetitive lifts can be covered by a generic plan. Anything complex, tandem lifts, lifts over occupied areas, or lifts near overhead power lines, needs a specific plan produced by an Appointed Person.

How All Star Safety Can Help

At All Star Safety, we provide expert planning and advice to ensure that lifting operations are conducted safely and in full compliance with LOLER 98, BS7121, MHSWR, and HASAWA. Demonstrating competence often means holding a recognised qualification, and we deliver lifting operations NVQs for slingers, lift supervisors and appointed persons. Our services include:

Lift Planning Services

We create detailed lift plans that outline the equipment required, the sequence of operations, and the necessary safety measures.

Competent Health and Safety Advice

As a competent H&S advisor, we offer guidance on all aspects of lifting operations and general workplace safety. See our full range of health and safety consultancy services.

Site Audits and Inspections

Our team can conduct comprehensive audits of your lifting operations and overall site safety. We help identify areas of improvement, ensure legal compliance, and provide actionable recommendations.

Frequently Asked Questions

What are the legal requirements for lifting operations in the UK?

Lifting operations are governed principally by LOLER 1998, which requires every lift to be properly planned by a competent person, appropriately supervised and carried out safely. PUWER 1998, MHSWR 1999 and the Health and Safety at Work etc. Act 1974 also apply, and BS7121 provides the recognised code of practice for the safe use of cranes.

Who can plan a lifting operation?

Planning must be carried out by a competent person, normally an Appointed Person who holds a relevant qualification such as a Level 5 NVQ in Controlling Lifting Operations. The employer is responsible for satisfying itself that the individual has the necessary training, knowledge and experience for the specific lift.

How often must lifting equipment be thoroughly examined?

Every six months for lifting accessories and for any equipment used to lift people, and every twelve months for other lifting equipment. Examination is also required after installation, after assembly at a new location, and following any event that may have affected the equipment's integrity. A written examination scheme drawn up by a competent person can set different intervals.

Is a lift plan a legal requirement?

LOLER Regulation 8 requires lifting operations to be properly planned, and in practice that means a documented lift plan. Routine and repetitive lifts can be covered by a generic plan, but complex lifts need one prepared specifically for that operation by an Appointed Person.

What qualifications do slinger signallers and lift supervisors need?

Both roles need to demonstrate competence, usually through an NVQ assessed in the workplace alongside a recognised plant or competence card. All Star Safety delivers NVQ assessments for slinger signaller, lift supervisor and appointed person roles across Suffolk, East Anglia and the wider UK.