Short answer: take it out of use straight away, label it, lock it away from serviceable stock and report it to the person responsible for lifting equipment. It should only come back if a competent person has examined it and recorded that it is safe, or it is repaired by someone authorised to do so. Under LOLER, lifting accessories need a thorough examination at least every six months, but a damaged item cannot wait for the next due date.
Spotting a cut sling or a bent shackle is only the first step. If it is left in the back of the van or hung back on the rack, someone else will pick it up for the next job. Good defect management links the pre-use check to a clear withdrawal and return process.
What should the defect report say?
Enough for someone else to find the item and understand the problem: its ID number or tag, where it is and what was found. “Sling looks worn” does not say which sling or why. A photo helps, but a photo is not approval to keep using it.
Everyone on site should know who to report to, including when the usual supervisor is off. Slinger signallers are often the first to spot damage, so make sure they know the route.
How do you stop it going back into use?
Physically separate it. A quarantine bin, a locked cage or a clearly marked shelf works, as long as the next shift and any other contractor will recognise it. A “do not use” tag only works if people respect it and it cannot fall off.
A competent person, using the manufacturer’s information. Discard criteria differ between webbing slings, chain slings, wire rope and shackles, so do not let someone invent local limits or carry out a repair they are not authorised to do. If in doubt, it stays in quarantine.
Do not swap in whatever looks similar from the back of the van. A replacement must be suitable for the planned lift, with a known safe working load and valid examination record. The same applies to improvised kit: ratchet straps are not lifting accessories, however strong they look.
How do you control the return to service?
Decide who can sign an item back into stock and what evidence they need: an examination report, a repair record or confirmation that it has been scrapped and replaced. Check that the ID on the item matches the paperwork.
A simple test is to compare what is in the quarantine bin with the defect reports. If an item is missing and nobody knows the outcome, it has probably gone back into use.
What should you do now?
Trace the last accessory defect from discovery to final outcome.
Set up a quarantine area everyone recognises, on every site and vehicle.
Name who receives reports and who can authorise return to service.
Brief slinger signallers and supervisors on the process.
Check that replacements are suitable and properly examined.
Our professional view
When we review lifting arrangements, the weak point is rarely the pre-use check itself. It is what happens next. If the trail ends with “I told the foreman”, the process needs tightening before the next defect turns up.
CITB has scheduled its remaining phase-four standardised plant training changes for 27 October 2026, covering Appointed Person and three tower-crane categories. For employers, training providers and lifting professionals, the important point is not simply that a new standard is planned: grant eligibility, provider approval and the distinction between training and occupational competence all need to be understood.
Phase four is scheduled to reach lifting-planning and tower-crane roles
CITB and the Plant Sector Representative Organisation have been rolling out standardised plant training standards in phases. CITB’s published timetable lists 27 October 2026 as the launch date for the remaining phase-four standards: Appointed Person, Tower Crane Operator – Trolley Jib – Cab Controlled, Tower Crane Operator – Luffing Jib – Cab Controlled, and Tower Crane Operator – Trolley Jib – Remote Controlled.
CITB’s phase-four update explains that the standards were developed with industry working groups involving employers, training providers and federations. The aim is to create more consistent training requirements and produce people who are better prepared for the responsibilities attached to the relevant plant category.
That matters particularly for Appointed Persons because the role is not a straightforward machine-operating function. Planning lifting operations requires judgement about the load, crane or lifting equipment, configuration, radius, ground conditions, accessories, exclusion zones, interfaces, sequencing and the competence of the lifting team.
The change is about standardised training and grant eligibility
The new CITB standard should not be confused with a new legal duty created on 27 October. The legal framework for planning lifting operations already exists. Regulation 8 of LOLER 1998 requires lifting operations involving lifting equipment to be properly planned by a competent person, appropriately supervised and carried out safely.
CITB’s change instead standardises the short-course training route and links it to grant rules. For CITB-registered employers seeking Short Course Grant for the updated plant categories, CITB says the training and testing must align with the relevant new standard and be delivered through an approved provider route.
CITB also states that the training must lead to a card carrying the CSCS logo and the achievement must be uploaded by the relevant Training Provider Network member or Approved Training Organisation. Employers therefore need to check the training route before booking rather than assume that any course carrying a familiar category name will attract grant.
Employers need to check provider approval before booking
For an employer, the practical purchasing question becomes more specific: is the provider approved to deliver the standard that applies on the training date, and will the achievement be reported correctly? That check should happen before the course takes place, particularly where the expected CITB grant forms part of the training budget.
It is also worth confirming what the course is intended to achieve. Initial training can develop the knowledge and skills needed for the role, but it does not by itself demonstrate that somebody can plan complex lifting operations independently across every type of project. Experience, supervision and the complexity of the work still matter.
NPORS providers have an additional approval step
CITB’s update says CPCS centres do not need to take additional action because existing approvals will be transferred to the new plant training standards. NPORS providers, including providers delivering both CPCS and NPORS, are instructed to contact CITB Quality Assurance with the categories they want to deliver so the required approvals can be provided.
For employers using NPORS, that makes provider verification particularly important. The issue is not whether NPORS remains a recognised route; it is whether the provider has the specific CITB approval needed for grant-eligible delivery against the applicable standard and can upload the achievement through the required reporting process.
Training standards do not replace occupational competence
An Appointed Person course and an occupational NVQ serve different purposes. Training is intended to develop knowledge and capability. A work-based NVQ assesses competence that is demonstrated through the person’s actual role, evidence and performance. Neither should be treated as permission to plan any lift regardless of experience, complexity or organisational support.
For people already working as Appointed Persons, the Level 5 NVQ Diploma in Controlling Lifting Operations – Planning Lifts provides a workplace-based route to evidence occupational competence and supports progression from a CPCS or NPORS trained-operator card to the relevant competent-operator card route.
The distinction is important for managers. A card, certificate or NVQ is evidence to consider when judging competence, but the employer still needs to decide whether the individual has the skills, knowledge, experience and support required for the lifting operation they are being asked to plan.
What should you do now?
Check the current CITB standard and launch status for any Appointed Person or affected tower-crane training taking place from 27 October 2026.
Confirm the provider is approved for the relevant standard before relying on CITB grant.
If using an NPORS provider, check that the provider has obtained the required CITB approval for the category.
Confirm how the achievement will be uploaded to trigger any grant entitlement.
Review whether people planning lifts have experience proportionate to the complexity and risk of the work they are being allocated.
Where a trained Appointed Person is working towards competent status, plan the NVQ evidence and card-upgrade route early rather than waiting for card expiry.
Our professional view
Standardised training should make it easier for employers to compare provision and understand what has been covered. The risk is assuming that a more consistent course removes the need for experienced judgement. Lifting plans remain project-specific, and the competence required to prepare them rises with the complexity of the operation.
All Star Safety supports experienced lifting professionals through its lifting operations NVQ routes, including the Level 5 Planning Lifts qualification for Appointed Persons who need to demonstrate workplace competence and progress their card status.
The Health and Safety Executive has now published its formal response to the 2025 call for evidence on the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER). The headline is straightforward: LOLER is not being amended at this stage.
That does not mean the subject has gone quiet. HSE concluded that the evidence did not justify legislative reform, but it did identify several areas where clearer guidance and, where appropriate, updates to the Approved Code of Practice could improve consistency and understanding.
Why HSE decided not to change LOLER
HSE received 176 responses from employees, contractors, advisers, representative bodies and other stakeholders. Its summary shows that 59% of respondents considered LOLER to remain fit for purpose, 65% said the Regulations were not duplicative and creating unnecessary burden, and 64% considered the current Approved Code of Practice to remain fit for purpose.
HSE therefore found no clear and proportionate case for changing the legislation. In particular, it did not find sufficient evidence that legislative reform would reduce burden without weakening safety outcomes, or that the benefits would outweigh the disruption and transitional costs.
The existing framework therefore remains in place. Lifting operations still need to be properly planned by a competent person, appropriately supervised and carried out safely. Lifting equipment must remain suitable for its intended use and, where applicable, subject to thorough examination in accordance with LOLER.
The important part is what HSE intends to clarify
Although the Regulations are staying, HSE identified recurring uncertainty around how they are interpreted. The regulator says improvements are better delivered through clearer guidance and ACoP updates than through rewriting the law.
what falls within the definition of lifting equipment;
the treatment of lifting accessories and suspended loads;
how LOLER interacts with other health and safety legislation, particularly PUWER;
the role of digital technology in thorough examination;
how LOLER applies where loads are winched or pulled but do not leave the ground; and
what should reasonably be expected of a competent person carrying out thorough examinations.
That last point is particularly significant. HSE found that some of the inconsistency around examination periods and assessment quality appears to stem from different interpretations of “competent person”, rather than from a weakness in LOLER itself. HSE has said it will keep this under review and clarify competency expectations through guidance and industry partners where opportunities arise.
Thorough examination intervals are not changing
The familiar six- and twelve-month examination periods remain the baseline. HSE has also reiterated that LOLER already provides flexibility through a written scheme of examination prepared by a competent person. Such a scheme can set different intervals where these are justified by a rigorous risk assessment, documented appropriately and available to an inspector if requested.
This is an important distinction: the regulations are not becoming more relaxed, but neither are they becoming more prescriptive. The emphasis remains on competent, evidence-based decisions.
A useful clarification on winching and pulling
HSE also gives a practical example of where the boundary between LOLER and PUWER can cause confusion. Where a load is winched but never leaves the ground, HSE states that it is being pulled rather than lifted, so LOLER does not apply. PUWER requirements still do.
That does not remove the need for planning, suitable equipment, inspection, competent operators or a safe system of work. It simply clarifies which regulatory framework applies to that particular activity.
What this means in practice for lifting operations
For organisations already managing lifting operations properly, the immediate message is not to rewrite every procedure or lift plan. The law has not changed. The more useful question is whether current arrangements stand up to the areas HSE has highlighted for clarification.
Is it clear who is competent to plan, supervise and carry out each part of the lifting operation?
Are lifting accessories properly selected, identified, examined and matched to the planned load?
Does the lift plan address the actual machine configuration, load characteristics, radius, capacity, accessories, ground conditions and working environment?
Are LOLER and PUWER being applied correctly rather than treated as interchangeable?
Where a written scheme of examination is used, is the rationale properly documented?
Are digital tools being used to support competent judgement rather than replace it?
What we are seeing through current lift planning and training work
The HSE response is particularly relevant to the work we have been carrying out recently. Our lift-planning support for AD Bly has involved detailed planning for excavator and telehandler lifting operations, including the load, lifting accessories, machine configuration and site-specific constraints. We have also supported MV Kelly with lift-plan review and site assurance around excavator lifting and telehandler operations.
On the training side, recent work has included bespoke lifting training delivered at Airbus, alongside regular lifting-related training and competence development. We have also been supporting lifting training with RHC/WH Scott, including practical slinger/signaller activities.
Across all of these activities, the recurring theme is the same: compliance is not achieved simply by having an item of equipment with enough nominal capacity or by holding a certificate. Safe lifting depends on competent planning, accurate information about the load and equipment, suitable accessories, effective supervision and people understanding the limits of their role.
Does HSE’s response amount to a tightening of LOLER?
Legally, no. The Regulations themselves are not being tightened or amended.
In practice, however, clearer guidance can raise the standard expected of dutyholders because areas that have previously been interpreted inconsistently become harder to treat as grey areas. The likely direction is therefore not more legislation, but clearer expectations around scope, competence, examination and the relationship between LOLER and other duties.
For businesses with established lifting-management systems, that should be manageable. For those relying on generic lift plans, poorly defined competence or examination arrangements that have simply “always been done that way”, it is a good time to review whether the current system is genuinely defensible.
What happens next?
HSE says it will continue engagement with industry, trade associations and technical bodies and will update guidance where opportunities arise, concentrating on areas of greatest risk and where clearer guidance could reduce unnecessary burden.
We will be monitoring those updates closely because changes to guidance on competence, examination and regulatory scope could have a direct effect on lifting procedures, training content and the advice given to clients.
By Aidan Earp, Managing Director, All Star Safety Ltd
A concrete skip might not be the first thing you expect to stop you at a crane and access show. But the remote-controlled SECATOL system demonstrated by Whitney at Vertikal Days on 9 September did just that.
The attraction was straightforward: operating the discharge gate remotely gives the team another option for deciding where the person controlling the pour needs to stand. That is a practical detail worth looking at closely.
What the remote actually controls
Whitney’s radio-remote concrete skip range includes an electric discharge mechanism operated by a handheld transmitter. The remote controls the skip’s gate and the release of concrete. The crane operator remains responsible for the crane’s movements.
The SECATOL VE literature we collected describes remote opening and closing, with the gate remaining in position when the control button is released. That gives the person controlling the discharge a way to adjust the opening without having to operate a rope at the skip.
Whitney Engineering is a UK distributor of SECATOL equipment. The supplier offers different skip arrangements, so the precise model, capacity and control specification need to be matched to the job. SECATOL’s own product information also shows an electric radio-controlled version of its TIC PF skip.
A SECATOL skip with an electric discharge mechanism. Supplier illustration from Whitney Engineering, rather than a photograph of the unit demonstrated at the show.
Why the demonstration caught our attention
Moving a control away from the equipment can change how a task is organised. In a concrete pour, that could give the person operating the gate more choice over their position and view, subject to the arrangement on site.
What matters is whether the chosen position actually improves control of the work. The person still needs to see the discharge area, understand what is happening and communicate effectively with everyone involved. A remote handset alone cannot answer those questions.
It was while watching this demonstration that I bumped into Michael Cuthbertson, Lifting Manager at Sizewell C. I trained Michael at Quinto when he moved from offshore work back to onshore many years ago. It was good to catch up and compare our impressions of what we were watching.
The conversation to have before using it on site
For a lifting team considering a system like this, I would start with a few practical questions.
Who controls what? The crane’s movement and the skip’s discharge are separate functions. Everyone needs to understand who is operating each, how they communicate and how either activity is stopped.
Where is the best operating position? Think about the view of the pour, the suspended skip, other workers and any hose or chute handling. The aim is to choose a position that works for the complete task.
What happens if the control is unavailable? Ask the supplier about loss of signal, battery condition and the exact model’s emergency arrangements. These need to be understood before the skip is in use.
Has the complete lifting arrangement been checked? The skip, concrete and all attached equipment contribute to the suspended load. The lifting plan needs to reflect the actual configuration and the movement required.
How will it be maintained and handed over? Cleaning, inspection, charging and familiarisation deserve attention alongside the demonstration of the controls.
An equipment improvement still needs a workable method
These are questions for the team developing the method, supported by the supplier’s instructions. HSE’s guidance on planning lifting operations places equipment selection, foreseeable risks and the way the work is organised within the same planning process.
What appealed to me at Newark was seeing a development aimed at a specific task that many lifting teams will recognise. It is the kind of idea that deserves a proper conversation about how the job could be done, including the people around the equipment.
If you are changing a lifting method or assessing the competence needed to use new equipment, get in touch with All Star Safety to discuss practical support.
Featured image: SECATOL remote handset and control equipment, supplied via Whitney Engineering’s product page. Supplier photographs illustrate the product range; they are not photographs of our visit.
By Aidan Earp, Managing Director, All Star Safety Ltd
Among the demonstrations we stopped to watch at Vertikal Days on 9 September, Torquer’s equipment stood out. Harriet, Lara and I saw two ideas tackling different parts of a lifting operation: making the connection to a load, and controlling which way that load faces. They were among the highlights in our account of the day at Newark.
The products are SPEAR and Catcher, and HALO. Seeing them demonstrated made it much easier to understand the possibilities than looking at a brochure alone.
SPEAR and Catcher: making and releasing the connection
SPEAR stands for Self Positioning Engage And Release. Torquer’s system uses a mechanical SPEAR connector with a matching Catcher. The intention is to connect and release a load through the lifting and landing sequence, reducing the need for someone to make that connection by hand at the load.
Our short video shows the tabletop demonstration: the SPEAR engages with the Catcher, the demonstration load is lifted, then landed before the connector releases. It is a useful illustration of the operating principle; the working equipment and its application need to be specified for the actual lift.
Our six-second video of the SPEAR and Catcher tabletop demonstration at Vertikal Days. The model engages, lifts, lands and releases.
What interested me was the point in the job that this addresses. Connecting and disconnecting equipment can put people close to the load. If a suitable system changes that task, it is worth asking how the whole operation could be arranged around it.
That starts with compatibility. A matching Catcher and a defined operating sequence are central to the idea. It should be considered as a specified lifting arrangement, with the manufacturer’s instructions, rather than assumed to work with any existing lifting point.
HALO: controlling the orientation of a suspended load
HALO stands for Hands free Autonomous Load Orientation. It allows the orientation of a suspended load to be controlled remotely. This addresses rotation during the lift, while SPEAR and Catcher address the connection.
The demonstration involving water and pumps was particularly memorable. Watching the suspended load turn made the idea very clear: control its orientation from a distance, with less reliance on people being close enough to influence it physically.
The HALO demonstrator at the show, with Torquer’s SPEAR information display behind it.
For me, the attraction is the opportunity to reconsider people’s positions during a lift. Whether that opportunity is useful depends on the load, the available space, the required movement and the conditions. A demonstration gives you a reason to investigate those details.
The questions we would take into a lift-planning discussion
Before introducing equipment like this into a job, these are some of the questions we would want to work through with the supplier and the lifting team:
What load and lifting arrangement is the chosen version designed for, and what equipment must be used with it?
How will the team confirm that the connection is secure and that release is appropriate?
What weight and headroom does the equipment add to the complete lifting arrangement?
Where will people stand, what will they be able to see and how will instructions be communicated?
What are the operating limits, inspection requirements and arrangements if the planned sequence cannot be completed?
These questions sit within the wider planning process. HSE’s guidance on planning lifting operations explains the need to consider the foreseeable risks, the resources required and the responsibilities of those involved. A new device needs to be understood within that complete operation.
Why it was worth stopping to watch
The best show demonstrations leave you thinking about a familiar task differently. These two did exactly that. We came away wanting to understand where the equipment could make the work easier to control, and what would need to change in the plan to get that benefit.
You can explore the equipment on Torquer’s website. If you are reviewing a lifting method or introducing unfamiliar equipment, All Star Safety’s consultancy support can help you work through the planning and competence questions.
Next in this series, we will look at Whitney’s SECATOL remote-controlled concrete skip discharge system, another demonstration that prompted a useful conversation about where people need to be during the work.
A lift plan can look straightforward until the accessories are added. Heavier shackles increase the suspended load. A load-specific sling-angle restriction can require longer legs and more headroom. A chain block may help position the load, but it also adds weight and height. These details can change whether the proposed arrangement will work.
A free reference to help you build the complete picture
All Star Safety’s 42-page lifting accessory reference helps Appointed Persons, lift supervisors and trainees find capacities, weights and dimensions, then compare different arrangements. It brings together named manufacturer data, dimension drawings, angle guidance and worked examples in an A4 handout.
Use it when developing a theoretical lift plan, checking an accessory schedule or exploring a different rigging arrangement. The useful question is whether the complete assembly suits the load, attachment points and available space.
We have made every effort to ensure the data is accurate at the date of issue. You must still check it yourself against current manufacturer instructions and the actual equipment before relying on it.
1. Calculate the mass of the whole suspended arrangement
Start with a verified load mass, then list everything suspended below the crane hook: complete sling assemblies, shackles, lifting points, hoists, beams and any other attachments. Establish what is already included in the stated load mass so that each item is counted once.
Worked example: a 10,000 kg load plus 500 kg of accessories gives a physical gross mass of 10,500 kg at the crane hook. In this example, the 500 kg includes every accessory below the hook, and none is already included in the load mass.
Use that complete arrangement when assessing crane capacity, following the crane manufacturer’s load-chart basis and required deductions, including the treatment of the hook block. Keep any planning or booking allowance explicit and separate from the physical mass calculation.
A common trap: shortening a chain sling changes its working length, but it does not remove the weight of chain that remains suspended. Include the complete assembly and retained chain.
2. Check how the sling angle affects headroom
A tighter angle limit can change the rigging you need. For example, a particular tank’s manufacturer may limit the included angle between accessories to 60° or less. That restriction takes precedence over a course convention or the wider angle permitted by a sling’s capacity chart.
Consider two equal, free sling legs connecting points 2.000 m apart at the same elevation. The included angle is the angle between the two legs; each leg is at half that angle from vertical.
Included angle
Free length of each leg
Vertical rise to the upper junction
90°
1.414 m
1.000 m
60°
2.000 m
1.732 m
Idealised geometry, rounded to the nearest millimetre. Fitting offsets and operational clearances are additional.
For the same 2 m spacing, the 60° arrangement requires longer free legs and 732 mm more vertical rise. This compares two different leg lengths; you cannot make that change simply by altering the angle of a fixed-length sling while keeping the attachment spacing unchanged.
Check the assembly’s working load limit for the actual configuration and angle, together with the load’s lifting-point restrictions. A larger sling does not increase the capacity of the lifting eye beneath it.
3. Build hook height from consistent reference points
Map the arrangement from the load’s attachment points to the crane hook bearing point. Add the relevant vertical contributions of the free sling legs, connectors, master link, hoist or other equipment, then allow for the load’s required position and operating clearance.
Read the dimension drawing: an overall dimension may differ from the distance between the bearing points needed in your calculation.
Check what the stated length includes: a complete sling’s effective working length is not automatically the free inclined leg length. Avoid adding end fittings twice.
Distinguish hoist dimensions: a chain block’s height of lift is not its closed headroom.
Recalculate after a substitution: a different shackle, lifting point or hoist can change mass, fit and height even when its headline capacity looks suitable.
Five checks before you finalise the arrangement
Load: confirm mass, centre of gravity, orientation and the manufacturer’s lifting instructions.
Connections: check attachment-point ratings, direction of pull, sling mode and angles, and physical compatibility.
Accessories: record the exact products, complete assembly masses and the dimensions used in your calculation.
Crane and space: assess the planned operating radius and height against the correct crane configuration and load chart, including required deductions and clearances.
Changes: review substitutions and changed site conditions, update the plan and make sure the lifting team understands the agreed arrangement.
These calculations are part of the wider lift plan. Ground conditions, access, the load route, people, weather and supervision also need consideration. HSE’s guidance on planning and organising lifting operations explains how planning, competence and resources should reflect the work and its risks.
What you will find in the download
The reference covers lifting eyes and swivel lifting points; shackles; chain, textile and wire-rope slings; master links; chain blocks; and selected handling attachments. Higher-capacity selections include the corresponding published masses, with manufacturer illustrations showing what the dimensions refer to.
Worked comparisons and an arrangement worksheet help you assess alternative accessories. Manufacturer identities and source links are retained, and historical Q45 information is clearly separated from current product ranges.
The handout labels All Star Safety’s 10%/25% planning allowances and normal 90° included-angle training convention separately from manufacturer limits and statutory requirements. Apply the tighter restriction imposed by the load or any component.
The free All Star Safety reference is formatted for A4 printing.
Check the source before using the figures
Product specifications can change, and equipment with similar names or capacities may have different weights, dimensions and limitations. Verify the exact product and assembly, the working load limit for its mode and angle, total accessory weight, dimensions, compatibility and load-specific restrictions.
Resolve missing, inconsistent or uncertain information before using it in a lift plan. The reference supports competent planning; it does not replace the manufacturer’s instructions, equipment checks or a lift-specific assessment. Please tell us if you identify a discrepancy so we can review and correct it.
RUD VLBG-PLUS instructions — product-specific installation and loading guidance for the identified RUD range. Follow the links in the PDF for other manufacturers.
Put the planning into practice with All Star Safety
Lift planning and consultancy: if you need a lift plan prepared, an independent review of an existing plan or Appointed Person support, our lifting operations consultancy services can help. Get us involved while you are selecting the equipment and arrangement, when there is still time to resolve questions.
Training for your team: our bespoke in-house safety training can be tailored to your working environment. Talk to us about the lifting topics your team needs to strengthen, such as accessory selection, gross-load calculations, hook-height checks and communicating the plan.
Need help preparing or reviewing a lift plan, developing your team’s skills or choosing a lifting NVQ? Get in touch with All Star Safety. Tell us about the load, equipment, site or training need and your proposed timescale, and we can discuss the support you require.
Ready to start now?
Use the Add to basket section on this page to select the number of learners you want to book for, then complete checkout and pay online to start the process.
Prefer to book through the office?
For help with your booking, other booking arrangements, or advice before paying, contact our team:
Questions before booking?
Contact our office to discuss any questions and find out more before you book. Our team can explain the course or qualification, how learning and assessment work, and help you choose the right option.
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.