Short answer: someone named, before the first person arrives. Employers must keep pedestrian routes reasonably safe in ice, frost and snow. That means knowing which routes people use, agreeing who monitors the forecast and grits, dealing with water brought indoors and checking conditions again during the day. HSE’s guidance is clear that gritting has to happen before ice forms, not after the first slip.
The first person on site on a cold morning often reaches the car park before whoever is meant to grit it. Rain gets carried into reception and a delivery blocks the usual entrance. Winter plans need to work at the times people actually arrive, including early starts, late finishes and weekends.
Which routes should you check?
Walk from the boundary or car park to where work begins. Include steps, ramps, side doors and the shortcuts people take when the main route is inconvenient. Ask early and late shift workers what they find outside office hours.
A marked-up site plan showing the problem areas and who deals with each is often more useful than a long document. Include places where water collects and where poor lighting hides changes in level. Lighting is worth a fresh look once the clocks go back.
Who acts on the forecast?
HSE’s guidance on ice, frost and snow says to identify vulnerable pedestrian areas, monitor the weather and act before icy surfaces form. Salt does not work instantly, and heavy rain can wash it away.
Agree who checks the forecast, who takes action and who covers when they are off. If a landlord or facilities contractor grits shared areas, confirm exactly what they cover and when. Gritting the access road does not mean every doorway, parking bay and footpath is included.
What about wet floors inside the entrance?
Gritting outside does nothing for a wet entrance floor. Check the matting is suitable, lies flat and still works at busy times. Think about cleaning, wet umbrellas and deliveries coming through the same door. A warning sign tells people about a problem; it does not fix it.
HSE’s cleaning guidance points out that cleaning itself can create slip hazards. Agree how a wet area is kept apart while it dries, keep a dry route open, and check what happens after the cleaner has gone.
Do conditions need checking during the day?
Yes. A shaded path can stay icy after the main yard thaws, and a blocked drain can send water across a walkway by lunchtime. Decide how people report a problem and who can close a route until it is sorted.
A small office might need one named person and a bag of salt. A distribution site with several entrances and shifts needs clearer allocation and handovers. Either way, the test is whether a reported problem gets dealt with.
What should you do now?
- Walk the pedestrian routes before the next cold spell.
- Name who checks the forecast, who grits and who covers absence.
- Confirm what any landlord or contractor actually covers.
- Check entrance matting and the cleaning arrangements.
- Ask an early or late shift worker whether the plan works for them.
- Record defects such as blocked drains or broken lights, and who will fix them.
Our professional view
Winter slip plans usually fail at the handover points: between landlord and tenant, between the cleaning contractor and the site team, or between the day shift and the early starters. Fix who does what at those points and most of the problem goes away. If your risk assessment has not been reviewed since the site layout or shift pattern changed, now is a good time.
All Star Safety Ltd carries out workplace inspections and practical risk reviews for employers across Suffolk and the UK. For a proportionate check of your winter arrangements, talk to our health and safety consultancy team on 01473 561402. Staff who want broader safety awareness can also take IOSH Working Safely.